Foster Wheeler Energia/ESB Lough Ree Power Station

Rebuilding absorber by replacing all the plate and support on three sections of the absorber.

The main equipment/plant used on site was Cranes 25 Ton to 350 Ton, Teleporters, MEWP’s, Welders/Generators, Scaffolding, forty foot trailers and low loaders with articulated lorry for transport between sites.

Also we subcontracted the transport of the large assembled items which weighed 40 ton, 55 ton and 80 ton to Whitten Haulage. These items were transported from the assembly site to the ESB Lough Ree power station.

Value: €1.5 million

Duration: May to September 2008